One promise, many moving parts: a fault is fixed once, and some are fixed again.

Find · Ways to fix it

3 ways lead

6 strong candidates of 26

What you record builds the shortlist.

  1. Leading

    Get ready before the work arrives

    Set up or automate in advance so work is faster when it arrives

    Why it leads: Your split by “Parts needed” shows “yes” cases take about 5.7 days longer (255 against 105 cases).

    How it helps: Get what the “Parts needed: yes” cases need ready before they reach the step that waits for it.

    From your records

  2. Leading

    Do steps at the same time

    Do two or more things at the same time instead of sequentially

    Why it leads: Your split by “Parts needed” shows “yes” cases take about 5.7 days longer (255 against 105 cases).

    How it helps: Start the extra work for the “Parts needed: yes” cases alongside the rest instead of after it.

    From your records

  3. Leading

    Work in planned batches

    Switch from constant processing to planned cycles or grouped runs

    Why it leads: Your split by “Parts needed” shows “yes” cases take about 5.7 days longer (255 against 105 cases).

    How it helps: Gather the “Parts needed: yes” cases into planned batches so the extra work is done together.

    From your records

Ways to fix it · 3 lead · 6 in play
Start to finish typical 9.2 business days · most 6.3–12.2 business days

fix.lab · See your work run

fix.lab · A hunch is something to test

Start to finish typical 9.2 business days · most 6.3–12.2 business days
Colour the cases by
yes 255no 105

Run these cases

Factor
The number, split by Parts needed
yes 255 cases · typical 11.2 business days
the middle half of the casesrow 1 (HS-2001): 14.8 business daysrow 2 (HS-2002): 10.3 business daysrow 3 (HS-2003): 11.2 business daysrow 5 (HS-2005): 10.8 business daysrow 6 (HS-2006): 9 business daysrow 9 (HS-2009): 11.3 business daysrow 11 (HS-2011): 7.4 business daysrow 12 (HS-2012): 10.5 business daysrow 13 (HS-2013): 15.9 business daysrow 14 (HS-2014): 10.8 business daysrow 15 (HS-2015): 9.2 business daysrow 16 (HS-2016): 8.8 business daysrow 17 (HS-2017): 16.7 business daysrow 18 (HS-2018): 16 business daysrow 19 (HS-2019): 8.4 business daysrow 20 (HS-2020): 12.8 business daysrow 22 (HS-2022): 13.5 business daysrow 23 (HS-2023): 9.2 business daysrow 24 (HS-2024): 19.8 business daysrow 26 (HS-2026): 7.7 business daysrow 27 (HS-2027): 9.8 business daysrow 28 (HS-2028): 12.9 business daysrow 30 (HS-2030): 8 business daysrow 31 (HS-2031): 12.8 business daysrow 32 (HS-2032): 10.6 business daysrow 34 (HS-2034): 14.3 business daysrow 35 (HS-2035): 11.2 business daysrow 36 (HS-2036): 13.5 business daysrow 37 (HS-2037): 11.9 business daysrow 38 (HS-2038): 13.5 business daysrow 39 (HS-2039): 11.1 business daysrow 40 (HS-2040): 11.7 business daysrow 41 (HS-2041): 14.1 business daysrow 42 (HS-2042): 8.2 business daysrow 44 (HS-2044): 14.8 business daysrow 46 (HS-2046): 11.4 business daysrow 47 (HS-2047): 7.6 business daysrow 48 (HS-2048): 18.7 business daysrow 49 (HS-2049): 12.9 business daysrow 50 (HS-2050): 12.3 business daysrow 53 (HS-2053): 15.5 business daysrow 54 (HS-2054): 8 business daysrow 55 (HS-2055): 12.8 business daysrow 56 (HS-2056): 11.5 business daysrow 57 (HS-2057): 9 business daysrow 59 (HS-2059): 8.3 business daysrow 60 (HS-2060): 11.8 business daysrow 61 (HS-2061): 11.8 business daysrow 62 (HS-2062): 13.3 business daysrow 63 (HS-2063): 12.2 business daysrow 64 (HS-2064): 13.4 business daysrow 65 (HS-2065): 11.6 business daysrow 66 (HS-2066): 8.6 business daysrow 67 (HS-2067): 9.1 business daysrow 68 (HS-2068): 14 business daysrow 69 (HS-2069): 8.1 business daysrow 70 (HS-2070): 8.8 business daysrow 71 (HS-2071): 12.2 business daysrow 72 (HS-2072): 10.9 business daysrow 73 (HS-2073): 12.1 business daysrow 74 (HS-2074): 8.6 business daysrow 75 (HS-2075): 8.4 business daysrow 79 (HS-2079): 11.7 business daysrow 80 (HS-2080): 13.8 business daysrow 81 (HS-2081): 8.6 business daysrow 83 (HS-2083): 8.8 business daysrow 84 (HS-2084): 8.5 business daysrow 85 (HS-2085): 11.9 business daysrow 86 (HS-2086): 12.5 business daysrow 87 (HS-2087): 8.7 business daysrow 88 (HS-2088): 8 business daysrow 89 (HS-2089): 13.9 business daysrow 90 (HS-2090): 8.4 business daysrow 91 (HS-2091): 14.1 business daysrow 94 (HS-2094): 12.6 business daysrow 96 (HS-2096): 17.5 business daysrow 97 (HS-2097): 12.9 business daysrow 101 (HS-2101): 16.5 business daysrow 102 (HS-2102): 7.6 business daysrow 103 (HS-2103): 14.2 business daysrow 105 (HS-2105): 9.4 business daysrow 108 (HS-2108): 9.3 business daysrow 109 (HS-2109): 12 business daysrow 110 (HS-2110): 10.1 business daysrow 113 (HS-2113): 12.1 business daysrow 117 (HS-2117): 15.6 business daysrow 118 (HS-2118): 11.4 business daysrow 119 (HS-2119): 7.4 business daysrow 120 (HS-2120): 8.6 business daysrow 125 (HS-2125): 8.8 business daysrow 127 (HS-2127): 12.4 business daysrow 128 (HS-2128): 11.2 business daysrow 129 (HS-2129): 11.8 business daysrow 131 (HS-2131): 8.5 business daysrow 132 (HS-2132): 12.5 business daysrow 134 (HS-2134): 12.5 business daysrow 135 (HS-2135): 11.9 business daysrow 136 (HS-2136): 7.4 business daysrow 138 (HS-2138): 10.8 business daysrow 139 (HS-2139): 9.3 business daysrow 142 (HS-2142): 9.9 business daysrow 143 (HS-2143): 8.7 business daysrow 144 (HS-2144): 11.9 business daysrow 145 (HS-2145): 13 business daysrow 146 (HS-2146): 9.2 business daysrow 148 (HS-2148): 15 business daysrow 149 (HS-2149): 12.5 business daysrow 150 (HS-2150): 7.8 business daysrow 151 (HS-2151): 12.4 business daysrow 152 (HS-2152): 10.8 business daysrow 153 (HS-2153): 11.2 business daysrow 154 (HS-2154): 11.5 business daysrow 155 (HS-2155): 8.2 business daysrow 156 (HS-2156): 8.6 business daysrow 157 (HS-2157): 9.2 business daysrow 158 (HS-2158): 8.5 business daysrow 160 (HS-2160): 8.8 business daysrow 161 (HS-2161): 12.2 business daysrow 162 (HS-2162): 7.5 business daysrow 163 (HS-2163): 11.1 business daysrow 164 (HS-2164): 14.5 business daysrow 165 (HS-2165): 13.9 business daysrow 166 (HS-2166): 12.7 business daysrow 169 (HS-2169): 7.5 business daysrow 170 (HS-2170): 8.7 business daysrow 171 (HS-2171): 14.2 business daysrow 172 (HS-2172): 14.1 business daysrow 173 (HS-2173): 16.2 business daysrow 175 (HS-2175): 7.5 business daysrow 176 (HS-2176): 11.8 business daysrow 179 (HS-2179): 11 business daysrow 180 (HS-2180): 8.3 business daysrow 185 (HS-2185): 11.1 business daysrow 186 (HS-2186): 13.4 business daysrow 187 (HS-2187): 8.4 business daysrow 188 (HS-2188): 12.5 business daysrow 190 (HS-2190): 7.5 business daysrow 191 (HS-2191): 11.5 business daysrow 192 (HS-2192): 14.8 business daysrow 195 (HS-2195): 10.6 business daysrow 196 (HS-2196): 7.5 business daysrow 197 (HS-2197): 9.5 business daysrow 198 (HS-2198): 10.4 business daysrow 200 (HS-2200): 11.4 business daysrow 201 (HS-2201): 18.8 business daysrow 202 (HS-2202): 8.2 business daysrow 203 (HS-2203): 8.6 business daysrow 205 (HS-2205): 6.6 business daysrow 206 (HS-2206): 20 business daysrow 207 (HS-2207): 10 business daysrow 208 (HS-2208): 16.8 business daysrow 209 (HS-2209): 7.4 business daysrow 211 (HS-2211): 7.6 business daysrow 213 (HS-2213): 13.4 business daysrow 216 (HS-2216): 15.8 business daysrow 217 (HS-2217): 11.1 business daysrow 218 (HS-2218): 8.6 business daysrow 219 (HS-2219): 12.6 business daysrow 220 (HS-2220): 11.4 business daysrow 222 (HS-2222): 11.2 business daysrow 223 (HS-2223): 15.7 business daysrow 224 (HS-2224): 8.1 business daysrow 227 (HS-2227): 12.2 business daysrow 229 (HS-2229): 13.4 business daysrow 230 (HS-2230): 11.4 business daysrow 231 (HS-2231): 18.4 business daysrow 232 (HS-2232): 10.1 business daysrow 234 (HS-2234): 13.3 business daysrow 237 (HS-2237): 10.8 business daysrow 240 (HS-2240): 13.4 business daysrow 241 (HS-2241): 11.1 business daysrow 243 (HS-2243): 12.7 business daysrow 245 (HS-2245): 8.1 business daysrow 246 (HS-2246): 8.2 business daysrow 248 (HS-2248): 8.5 business daysrow 250 (HS-2250): 12.2 business daysrow 251 (HS-2251): 9.9 business daysrow 252 (HS-2252): 11.8 business daysrow 255 (HS-2255): 12 business daysrow 259 (HS-2259): 15 business daysrow 261 (HS-2261): 16 business daysrow 262 (HS-2262): 8 business daysrow 263 (HS-2263): 13.5 business daysrow 264 (HS-2264): 8 business daysrow 267 (HS-2267): 8.4 business daysrow 269 (HS-2269): 12.6 business daysrow 271 (HS-2271): 14.6 business daysrow 272 (HS-2272): 11.9 business daysrow 273 (HS-2273): 12.8 business daysrow 274 (HS-2274): 8.7 business daysrow 275 (HS-2275): 13.4 business daysrow 278 (HS-2278): 10.6 business daysrow 279 (HS-2279): 11 business daysrow 280 (HS-2280): 7.9 business daysrow 281 (HS-2281): 11.4 business daysrow 282 (HS-2282): 12.6 business daysrow 283 (HS-2283): 13.5 business daysrow 284 (HS-2284): 12 business daysrow 287 (HS-2287): 12.6 business daysrow 288 (HS-2288): 13 business daysrow 289 (HS-2289): 12.5 business daysrow 291 (HS-2291): 13.4 business daysrow 292 (HS-2292): 12.5 business daysrow 293 (HS-2293): 9.5 business daysrow 294 (HS-2294): 7.3 business daysrow 295 (HS-2295): 11.6 business daysrow 296 (HS-2296): 7.3 business daysrow 297 (HS-2297): 8.8 business daysrow 298 (HS-2298): 7.7 business daysrow 299 (HS-2299): 13.3 business daysrow 300 (HS-2300): 9.1 business daysrow 301 (HS-2301): 9.3 business daysrow 302 (HS-2302): 10.4 business daysrow 304 (HS-2304): 11.5 business daysrow 306 (HS-2306): 9.8 business daysrow 307 (HS-2307): 13.1 business daysrow 309 (HS-2309): 7.3 business daysrow 310 (HS-2310): 11.9 business daysrow 311 (HS-2311): 10.5 business daysrow 312 (HS-2312): 12.6 business daysrow 313 (HS-2313): 11.2 business daysrow 314 (HS-2314): 10.6 business daysrow 315 (HS-2315): 8 business daysrow 317 (HS-2317): 9.6 business daysrow 318 (HS-2318): 11.1 business daysrow 319 (HS-2319): 8 business daysrow 320 (HS-2320): 12.2 business daysrow 321 (HS-2321): 11.5 business daysrow 322 (HS-2322): 8.5 business daysrow 323 (HS-2323): 11.7 business daysrow 324 (HS-2324): 14.6 business daysrow 325 (HS-2325): 8.4 business daysrow 327 (HS-2327): 10.3 business daysrow 329 (HS-2329): 7.9 business daysrow 331 (HS-2331): 12.7 business daysrow 333 (HS-2333): 13.7 business daysrow 334 (HS-2334): 11.3 business daysrow 336 (HS-2336): 8.9 business daysrow 338 (HS-2338): 16.8 business daysrow 340 (HS-2340): 14.9 business daysrow 341 (HS-2341): 9.2 business daysrow 342 (HS-2342): 16.3 business daysrow 345 (HS-2345): 7.7 business daysrow 346 (HS-2346): 10.6 business daysrow 347 (HS-2347): 10.5 business daysrow 348 (HS-2348): 10.8 business daysrow 349 (HS-2349): 8.5 business daysrow 350 (HS-2350): 15 business daysrow 351 (HS-2351): 9.4 business daysrow 352 (HS-2352): 9.1 business daysrow 355 (HS-2355): 7.2 business daysrow 357 (HS-2357): 14.6 business daysrow 358 (HS-2358): 10.6 business daysrow 359 (HS-2359): 12.3 business daysrow 360 (HS-2360): 12 business daysthe middle case4.1 business days20 business days
no 105 cases · typical 5.5 business days
the middle half of the casesrow 4 (HS-2004): 6.1 business daysrow 7 (HS-2007): 4.1 business daysrow 8 (HS-2008): 4.9 business daysrow 10 (HS-2010): 4.6 business daysrow 21 (HS-2021): 4.7 business daysrow 25 (HS-2025): 6 business daysrow 29 (HS-2029): 5.8 business daysrow 33 (HS-2033): 5.2 business daysrow 43 (HS-2043): 5.3 business daysrow 45 (HS-2045): 4.9 business daysrow 51 (HS-2051): 5.3 business daysrow 52 (HS-2052): 5.7 business daysrow 58 (HS-2058): 5.6 business daysrow 76 (HS-2076): 5.8 business daysrow 77 (HS-2077): 4.9 business daysrow 78 (HS-2078): 4.9 business daysrow 82 (HS-2082): 5.4 business daysrow 92 (HS-2092): 5.4 business daysrow 93 (HS-2093): 4.6 business daysrow 95 (HS-2095): 5.9 business daysrow 98 (HS-2098): 5.4 business daysrow 99 (HS-2099): 6.8 business daysrow 100 (HS-2100): 6.2 business daysrow 104 (HS-2104): 6.5 business daysrow 106 (HS-2106): 7.1 business daysrow 107 (HS-2107): 6.4 business daysrow 111 (HS-2111): 5.5 business daysrow 112 (HS-2112): 5 business daysrow 114 (HS-2114): 6.7 business daysrow 115 (HS-2115): 5.4 business daysrow 116 (HS-2116): 4.8 business daysrow 121 (HS-2121): 5.3 business daysrow 122 (HS-2122): 5.3 business daysrow 123 (HS-2123): 6.1 business daysrow 124 (HS-2124): 5.3 business daysrow 126 (HS-2126): 5.8 business daysrow 130 (HS-2130): 4.7 business daysrow 133 (HS-2133): 5.2 business daysrow 137 (HS-2137): 5.9 business daysrow 140 (HS-2140): 5.8 business daysrow 141 (HS-2141): 5.6 business daysrow 147 (HS-2147): 6.3 business daysrow 159 (HS-2159): 6.4 business daysrow 167 (HS-2167): 5.4 business daysrow 168 (HS-2168): 5.3 business daysrow 174 (HS-2174): 5.7 business daysrow 177 (HS-2177): 6.2 business daysrow 178 (HS-2178): 7.8 business daysrow 181 (HS-2181): 5.1 business daysrow 182 (HS-2182): 5.4 business daysrow 183 (HS-2183): 6.9 business daysrow 184 (HS-2184): 6.3 business daysrow 189 (HS-2189): 5.5 business daysrow 193 (HS-2193): 5.3 business daysrow 194 (HS-2194): 5.3 business daysrow 199 (HS-2199): 4.1 business daysrow 204 (HS-2204): 5.5 business daysrow 210 (HS-2210): 4.9 business daysrow 212 (HS-2212): 5.2 business daysrow 214 (HS-2214): 5.5 business daysrow 215 (HS-2215): 5.6 business daysrow 221 (HS-2221): 5.8 business daysrow 225 (HS-2225): 7.2 business daysrow 226 (HS-2226): 4.4 business daysrow 228 (HS-2228): 5.1 business daysrow 233 (HS-2233): 5.6 business daysrow 235 (HS-2235): 8.3 business daysrow 236 (HS-2236): 6.6 business daysrow 238 (HS-2238): 5.4 business daysrow 239 (HS-2239): 6.9 business daysrow 242 (HS-2242): 5.1 business daysrow 244 (HS-2244): 5.4 business daysrow 247 (HS-2247): 6.5 business daysrow 249 (HS-2249): 6.2 business daysrow 253 (HS-2253): 4.8 business daysrow 254 (HS-2254): 5.8 business daysrow 256 (HS-2256): 5.6 business daysrow 257 (HS-2257): 5.1 business daysrow 258 (HS-2258): 6.4 business daysrow 260 (HS-2260): 5.1 business daysrow 265 (HS-2265): 5.7 business daysrow 266 (HS-2266): 5.7 business daysrow 268 (HS-2268): 5.2 business daysrow 270 (HS-2270): 4.8 business daysrow 276 (HS-2276): 6 business daysrow 277 (HS-2277): 4.4 business daysrow 285 (HS-2285): 4.3 business daysrow 286 (HS-2286): 6.1 business daysrow 290 (HS-2290): 5.6 business daysrow 303 (HS-2303): 4.7 business daysrow 305 (HS-2305): 5.8 business daysrow 308 (HS-2308): 5.3 business daysrow 316 (HS-2316): 5.7 business daysrow 326 (HS-2326): 5.8 business daysrow 328 (HS-2328): 5.6 business daysrow 330 (HS-2330): 4.4 business daysrow 332 (HS-2332): 5.4 business daysrow 335 (HS-2335): 5.8 business daysrow 337 (HS-2337): 4.2 business daysrow 339 (HS-2339): 5.7 business daysrow 343 (HS-2343): 6.4 business daysrow 344 (HS-2344): 5.1 business daysrow 353 (HS-2353): 5.5 business daysrow 354 (HS-2354): 5.7 business daysrow 356 (HS-2356): 5.9 business daysthe middle case4.1 business days20 business days

What it must reach. If cases where “Parts needed” is yes took as long as the rest, the typical for all cases would move from 9.2 business days to about 5.5 business days.

fix.lab · Fix the work, then automate it

Improve

Today

Start to finish typical 9.2 business days · most 6.3–12.2 business days
  1. 1

    A customer reports a fault

    30 min typical

    about 1% of the typical time

  2. 2

    The fault is triaged and a visit booked

    1 business day typical

    about 11% of the typical time

  3. 3

    The engineer visits and diagnoses

    2 business days typical

    about 22% of the typical time

  4. 4

    The parts are ordered from the regional depot

    1 business day typical

    about 11% of the typical time

  5. 5

    The parts arrive

    3 business days typical

    about 33% of the typical time

  6. 6

    The repair is made

    1 business day typical

    about 11% of the typical time

  7. 7

    The repair is checked

    1 h typical

    ↺ goes back to step 3

    about 1% of the typical time

  8. 8

    The customer confirms it is fixed

    1 business day typical

    about 11% of the typical time

Start from an idea on your shortlist

  • a strong fit with what you have recorded
  • a fit worth taking seriously
  • a fit worth taking seriously
  • may still fit
  • may still fit
  • may still fit

With your changes

Start to finish typical 8.2 business days · most 6.3–9.2 business days

What it would do

  1. The lowest that still keeps the promise—

    No promise is stated, so there is nothing to keep yet.

  2. Your settings8.2 days

    Start to finish, the middle case takes 65.667 hours with your settings, against 73.25 hours today.

  3. The most to hope for7.7 days

    Start to finish, the middle case would take about 61.55 hours if every case followed the new way at the pace of your quickest tenth, with nothing going back round.

What this rests on

  • Time held at “The parts arrive”: 8 hours, your guess
  • Adoption at “The parts arrive”: 65%, your guess
  • The promise counts as kept when 90% of cases meet it, your guess (change it above)

Kept

Kept since 2026-09-14. eXecute is reading it week by week.

fix.lab · One number you can trust

eXecute

EARLY WARNINGThe number is steady, but Parts orders in before the depot cut-off has moved outside its usual range. Look at it before the number follows.Driven by: the cause “Parts orders in before the depot cut-off”

The number

Steady · Within the usual wobble, inside the goal you set

The last 8 weeks have stayed within the usual wobble around 6.95 business days; nothing needs a reaction. 2% of the latest 4 weeks went past the promise (8 business days), inside the 20% you said is good enough.

Leave it alone. Reacting to the usual wobble makes the process worse, not better.

The causes you watch

the trial’s weeks
Parts orders in before the depot cut-off
2026-08-17: 782026-08-24: 802026-08-31: 772026-09-07: 792026-09-14: 762026-09-21: 722026-09-28: 672026-10-05: 61
Something changed kept range 77 to 80
Repeat visits
2026-08-17: 112026-08-24: 122026-08-31: 102026-09-07: 122026-09-14: 112026-09-21: 122026-09-28: 102026-10-05: 11
Usual wobble, do nothing kept range 10 to 12

The number has not moved, so no new Dig is needed.

Start to finish typical 9.2 business days · most 6.3–12.2 business days
  1. 1

    A customer reports a fault

    30 min typical

    about 1% of the typical time

  2. 2

    The fault is triaged and a visit booked

    1 business day typical

    about 11% of the typical time

  3. 3

    The engineer visits and diagnoses

    2 business days typical

    about 22% of the typical time

  4. 4

    The parts are ordered from the regional depot

    1 business day typical

    about 11% of the typical time

  5. 5

    The parts arrive

    3 business days typical

    about 33% of the typical time

  6. 6

    The repair is made

    1 business day typical

    about 11% of the typical time

  7. 7

    The repair is checked

    1 h typical

    ↺ goes back to step 3

    about 1% of the typical time

  8. 8

    The customer confirms it is fixed

    1 business day typical

    about 11% of the typical time

An example

When you are ready, start with your own process: the coach works alongside you.